Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

First bridge across the Yukon River

Journal Article · · Civil Engineering, ASCE; (United States)
OSTI ID:6777068
Until recently, the Yukon River was a major obstacle in constructing a roadway to the oil-rich North Slope of Alaska. But on Oct 10, 1975, that obstacle was hurdled when the first bridge across the Yukon was open to traffic. This new $30,000,000 crossing is located 100 miles northwest of Fairbanks. The remote location, extremely cold climate, and other environmental factors called for unusual design and construction. Twin orthotropic steel box girders support a 30 ft wide roadway. Later, the bridge will carry two 48 in. crude oil pipelines. The bridge's reinforced concrete piers are secured to bedrock on the river bottom with prestressed rock anchors. Because of the very low ambient temperatures, brittle fracture was an overriding concern. Exceptionally tough A537 steel (pressure vessel steel) was used in all major tension areas of girders. Toughness requirements were so stringent that only Japanese producers would quote on the project.
OSTI ID:
6777068
Journal Information:
Civil Engineering, ASCE; (United States), Journal Name: Civil Engineering, ASCE; (United States) Vol. 46:8
Country of Publication:
United States
Language:
English

Similar Records

Radiographic examination of prestressed concrete box girder bridges
Journal Article · Tue Oct 01 00:00:00 EDT 1996 · Materials Performance · OSTI ID:376280

Tanana River pipeline suspension bridge
Journal Article · Fri Dec 31 23:00:00 EST 1976 · Mil. Eng.; (United States) · OSTI ID:7258028

Yukon Delta: A synthesis of information
Technical Report · Sat Dec 31 23:00:00 EST 1988 · OSTI ID:7152840