Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Relief-well requirements to kill a high-rate gas blowout from a deepwater reservoir

Journal Article · · J. Pet. Technol.; (United States)
DOI:https://doi.org/10.2118/16131-PA· OSTI ID:6775497
 [1];  [2]
  1. Triton Engineering Services Co. (US)
  2. Cameron Iron Works (US)
Relief-well requirements were investigated for a dynamic kill of a high-rate gas blowout from a deepwater reservoir to define any necessary special procedures or equipment. Results of the investigation show that a high injection rate and a special-design large-diameter injection riser are required to dynamically kill such a blowout with seawater. The injection riser is necessary to limit surface pump pressure during the high-rate kill operation. Procedures to complete the kill operation hydrostatically with heavy fluid following the dynamic kill are outlined.
OSTI ID:
6775497
Journal Information:
J. Pet. Technol.; (United States), Journal Name: J. Pet. Technol.; (United States) Vol. 40:12; ISSN JPTJA
Country of Publication:
United States
Language:
English