Pit disassembly and conversion demonstration environmental assessment and research and development activities
A significant portion of the surplus plutonium is in the form of pits, a nuclear weapons component. Pits are composed of plutonium which is sealed in a metallic shell. These pits would need to be safely disassembled and permanently converted to an unclassified form that would be suitable for long-term disposition and international inspection. To determine the feasibility of an integrated pit disassembly and conversion system, a Pit Disassembly and Conversion Demonstration is proposed to take place at the Los Alamos National Laboratory (LANL). This demonstration would be done in existing buildings and facilities, and would involve the disassembly of up to 250 pits and conversion of the recovered plutonium to plutonium metal ingots and plutonium dioxide. This demonstration also includes the conversion of up to 80 kilograms of clean plutonium metal to plutonium dioxide because, as part of the disposition process, some surplus plutonium metal may be converted to plutonium dioxide in the same facility as the surplus pits. The equipment to be used for the proposed demonstration addressed in this EA would use some parts of the Advanced Recovery and Integrated Extraction System (ARIES) capability, other existing equipment/capacities, plus new equipment that was developed at other sites. In addition, small-scale R and D activities are currently underway as part of the overall surplus plutonium disposition program. These R and D activities are related to pit disassembly and conversion, MOX fuel fabrication, and immobilization (in glass and ceramic forms). They are described in Section 7.0. On May 16, 1997, the Office of Fissile Materials Disposition (MD) notified potentially affected states and tribes that this EA would be prepared in accordance with NEPA. This EA has been prepared to provide sufficient information for DOE to determine whether a Finding of No Significant Impact (FONSI) is warranted or whether an EIS must be prepared.
- Research Organization:
- Dept. of Energy Office of Fissile Materials Disposition, Washington, DC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 677037
- Report Number(s):
- DOE/EA--1207; ON: DE99000907; NC: NONE
- Country of Publication:
- United States
- Language:
- English
Similar Records
The United States pit disassembly and conversion project -- Meeting the MOX fuel specification
Design-only conceptual design report for pit disassembly and conversion facility. Rev 0
Advanced Recovery and Integrated Extraction System (ARIES): The United State's demonstration line for pit disassembly and conversion
Conference
·
Wed Dec 30 23:00:00 EST 1998
·
OSTI ID:319598
Design-only conceptual design report for pit disassembly and conversion facility. Rev 0
Technical Report
·
Thu Dec 11 23:00:00 EST 1997
·
OSTI ID:585066
Advanced Recovery and Integrated Extraction System (ARIES): The United State's demonstration line for pit disassembly and conversion
Conference
·
Sat Feb 28 23:00:00 EST 1998
·
OSTI ID:1347