Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station
Journal Article
·
· Nuclear Technology; (United States)
OSTI ID:6757597
- Pacific Northwest Lab., Richland, WA (United States)
As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants.
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 6757597
- Journal Information:
- Nuclear Technology; (United States), Journal Name: Nuclear Technology; (United States) Vol. 102:3; ISSN 0029-5450; ISSN NUTYBB
- Country of Publication:
- United States
- Language:
- English
Similar Records
A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station
A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1
Development of in-service inspection priorities for pressurized water reactor high-pressure injection system components
Technical Report
·
Mon Aug 01 00:00:00 EDT 1994
·
OSTI ID:10178938
A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1
Technical Report
·
Fri Jan 31 23:00:00 EST 1997
·
OSTI ID:446366
Development of in-service inspection priorities for pressurized water reactor high-pressure injection system components
Journal Article
·
Thu Mar 31 23:00:00 EST 1994
· Nuclear Technology; (United States)
·
OSTI ID:5066543
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
BATTELLE PACIFIC NORTHWEST LABORATORIES
ENRICHED URANIUM REACTORS
FAILURE MODE ANALYSIS
IN-SERVICE INSPECTION
INSPECTION
MATERIALS TESTING
NATIONAL ORGANIZATIONS
NONDESTRUCTIVE TESTING
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
PLANNING
POWER PLANTS
POWER REACTORS
PWR TYPE REACTORS
REACTORS
RISK ASSESSMENT
SURRY-1 REACTOR
SYSTEM FAILURE ANALYSIS
SYSTEMS ANALYSIS
TESTING
THERMAL POWER PLANTS
THERMAL REACTORS
US DOE
US ERDA
US ORGANIZATIONS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
BATTELLE PACIFIC NORTHWEST LABORATORIES
ENRICHED URANIUM REACTORS
FAILURE MODE ANALYSIS
IN-SERVICE INSPECTION
INSPECTION
MATERIALS TESTING
NATIONAL ORGANIZATIONS
NONDESTRUCTIVE TESTING
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
PLANNING
POWER PLANTS
POWER REACTORS
PWR TYPE REACTORS
REACTORS
RISK ASSESSMENT
SURRY-1 REACTOR
SYSTEM FAILURE ANALYSIS
SYSTEMS ANALYSIS
TESTING
THERMAL POWER PLANTS
THERMAL REACTORS
US DOE
US ERDA
US ORGANIZATIONS
WATER COOLED REACTORS
WATER MODERATED REACTORS