Work plan for new SY tank farm exhauster, on-site fabrication activities

Technical Report ·
OSTI ID:6743214
The replacement SY tank farm exhauster unit is a new piece of equipment, designed to replace the existing SY tank farm K1 Ventilation System exhauster unit. This work plan describes the shop fabrication activities associated with the receiving, assembly, repair, modification, and testing of the new SY tank farm primary exhauster. A general list of these activities include, but are not limited to: repair all shipping damages, including procurement of replacement parts; fabricate hardware needed to install exhauster in the field (e.g., Vent duct tie-in, duct concrete footings/hangers, stack concrete footings, etc.); incorporate equipment modification as provided by WHC Engineering (e.g., Rewire the Alarm Annunciator Cabinet as fail-safe, connections between the exhauster and stack sample cabinet, etc.); test the entire exhauster unit, to the extent possible, prior to field installation; and prepare exhauster unit for transfer to and installation at SY tank farm.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
6743214
Report Number(s):
WHC-SD-WM-WP-291; ON: DE95004101
Country of Publication:
United States
Language:
English