Design cost scoping studies. Nevada Test Site Terminal Waste Storage Program, Subtask 1. 3: facility hardening studies
As part of a program being conducted by the U.S. Department of Energy, Nevada Operations Office, to determine the feasibility of establishing a terminal waste storage repository at the Nevada Test Site, URS/John A. Blume and Associates, Engineers, made approximate determinations of the additional costs required to provide protection of structures against seismic forces. A preliminary estimate is presented of the added costs required to harden the surface structures, underground tunnels and storage rooms, and vertical shafts of the repository against ground motion caused by earthquakes and underground nuclear explosions (UNEs). The conceptual design of all of the structures was adapted from proposed bedded-salt waste-isolation repositories. Added costs for hardening were calculated for repositories in three candidate geological materials (Eleana argillite, Climax Stock granite, and Jackass Flats tuff) for several assumed peak ground accelerations caused by earthquakes (0.3g, 0.5g, and 0.7g) and by UNEs (0.5g, 0.7g, and 1.0g). Hardening procedures to protect the tunnels, storage rooms, and shafts against incremental seismic loadings were developed from (1) qualitative considerations of analytically determined seismic stresses and (2) engineering evaluations of the dynamic response of the rock mass and the tunnel support systems. The added costs for seismic hardening of the surface structures were found to be less than 1% of the estimated construction cost of the surface structures. For the underground structures, essentially no hardening was required for peak ground accelerations up to 0.3g; however, added costs became significant at 0.5g, with a possible increase in structural costs for the underground facilities of as much as 35% at 1.0g.
- Research Organization:
- URS/John A. Blume and Associates, Engineers, San Francisco, CA (USA)
- DOE Contract Number:
- EY-76-C-08-0099
- OSTI ID:
- 6743154
- Report Number(s):
- JAB-99-123
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tunnel Damage Resulting from Seismic Loading
Processed seismic motion records from Little Skull Mountain, Nevada earthquake of June 29, 1992, recorded at stations in southern Nevada
Processed seismic motion records from St. George, Utah earthquake of September 2, 1992, recorded at seismic stations in southern Nevada
Conference
·
Wed Sep 12 00:00:00 EDT 1990
·
OSTI ID:137959
Processed seismic motion records from Little Skull Mountain, Nevada earthquake of June 29, 1992, recorded at stations in southern Nevada
Technical Report
·
Wed Dec 30 23:00:00 EST 1992
·
OSTI ID:138749
Processed seismic motion records from St. George, Utah earthquake of September 2, 1992, recorded at seismic stations in southern Nevada
Technical Report
·
Wed Mar 31 23:00:00 EST 1993
·
OSTI ID:10173644
Related Subjects
052002* -- Nuclear Fuels-- Waste Disposal & Storage
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
COST
EARTHQUAKES
EXPLOSIONS
GRANITES
IGNEOUS ROCKS
MANAGEMENT
NATIONAL ORGANIZATIONS
NEVADA TEST SITE
NUCLEAR EXPLOSIONS
RADIOACTIVE WASTE STORAGE
ROCKS
SEISMIC EVENTS
SILT
STORAGE
TUFF
UNDERGROUND EXPLOSIONS
UNDERGROUND STORAGE
US DOE
US ORGANIZATIONS
WASTE MANAGEMENT
WASTE STORAGE
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
COST
EARTHQUAKES
EXPLOSIONS
GRANITES
IGNEOUS ROCKS
MANAGEMENT
NATIONAL ORGANIZATIONS
NEVADA TEST SITE
NUCLEAR EXPLOSIONS
RADIOACTIVE WASTE STORAGE
ROCKS
SEISMIC EVENTS
SILT
STORAGE
TUFF
UNDERGROUND EXPLOSIONS
UNDERGROUND STORAGE
US DOE
US ORGANIZATIONS
WASTE MANAGEMENT
WASTE STORAGE