Development of a 10 MW facility-Part 3; Tunnel liner design and construction
Conference
·
· Proceedings of the American Power Conference; (USA)
OSTI ID:6738595
- Paul C. Rizzo Associates, Inc., Pittsburgh, PA (US)
The Yough hydro project is on the east abutment of the Youghiogheny River Lake Dam located on the Youghiogheny River in Somerset County, Pennsylvania. This paper reports on the design and construction of the project. The dam, built in the 1940s, is owned by the federal government and operated by the U.S. Army Corps of Engineers, Pittsburgh District, as a flood control and low-flow augmentation project. The Yough hydro project will utilize flows which are discharged through the outlet works of the dam in accordance with the current reservoir operating procedures; consequently, the project is run-of-river. The outlet works for the existing dam consist of a 18-foot diameter, 1,800-foot long, concrete-lined (18 inches thick) and steel ribbed (8WF27) tunnel. The tunnel discharge is controlled by three vertical lift gates located near the midpoint of the tunnel. The plan and profile of the existing project are shown.
- OSTI ID:
- 6738595
- Report Number(s):
- CONF-890425--
- Conference Information:
- Journal Name: Proceedings of the American Power Conference; (USA) Journal Volume: 51
- Country of Publication:
- United States
- Language:
- English
Similar Records
Diverting water at dams during construction of hydro plants
Design features of the Murray Hydroelectric Project
Lock and Dam Number 1 hydropower study, Mississippi River at Minneapolis-St. Paul, Minnesota. Technical report
Journal Article
·
Sun Mar 31 23:00:00 EST 1991
· Hydro Review; (United States)
·
OSTI ID:5663014
Design features of the Murray Hydroelectric Project
Journal Article
·
Thu Jun 01 00:00:00 EDT 1989
· IEEE Trans. Power Electronics; (United States)
·
OSTI ID:6108333
Lock and Dam Number 1 hydropower study, Mississippi River at Minneapolis-St. Paul, Minnesota. Technical report
Technical Report
·
Mon Oct 01 00:00:00 EDT 1984
·
OSTI ID:5713041
Related Subjects
13 HYDRO ENERGY
130100 -- Hydro Energy-- Resources & Availability
130300* -- Hydro Energy-- Plant Design & Operation
42 ENGINEERING
422000 -- Engineering-- Mining & Underground Engineering-- (1980-)
CONSTRUCTION
CONTROL
DAMS
DESIGN
FEDERAL REGION III
FLOOD CONTROL
HYDROELECTRIC POWER PLANTS
NORTH AMERICA
PENNSYLVANIA
POWER PLANTS
TUNNELS
UNDERGROUND FACILITIES
USA
130100 -- Hydro Energy-- Resources & Availability
130300* -- Hydro Energy-- Plant Design & Operation
42 ENGINEERING
422000 -- Engineering-- Mining & Underground Engineering-- (1980-)
CONSTRUCTION
CONTROL
DAMS
DESIGN
FEDERAL REGION III
FLOOD CONTROL
HYDROELECTRIC POWER PLANTS
NORTH AMERICA
PENNSYLVANIA
POWER PLANTS
TUNNELS
UNDERGROUND FACILITIES
USA