skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Full-scale radium-removal system for a small community. Research report, 1 October 1985-30 September 1987

Technical Report ·
OSTI ID:6737898

A radium-removal treatment plant was constructed for the small community of Redhill Forest in the central mountains of Colorado. The plant consists of iron removal using oxidation, filtration, and settling; radium and hardness removal using ion exchange; and radium removal from the waste brine using Dow Chemical Company's Radium Selective Complexer (RSC). The raw water comes from deep wells and has naturally occuring radium and iron concentrations of about 30-40 pC/L and 7-10 mg/L, respectively, and is aerated before entering the main treatment plant to remove radon gas and carbon dioxide. A unique feature of the plant is the process that removes radium from the waste brine. The process removes only radium from the spent ion-exchange regeneration water by permanently complexing the radium on the RSC. The RSC is replaced when exhausted and sent to a final disposal site that is acceptable to state regulatory agencies. The overall plant reduces radium from about 35 pCi/L to less than 4 pCi/L. The RSC system has consistently removed over 99% of the radium from the spent ion exchange regenerant. The average inflow radium concentration to the RSC was about 1180 pCi/L, and the average effluent was about 9 pCi/L.

Research Organization:
Redhill Forest Property Owners Association, Fairplay, CO (USA)
OSTI ID:
6737898
Report Number(s):
PB-88-237904/XAB
Country of Publication:
United States
Language:
English