Extended burnup demonstration reactor fuel program. Semiannual progress report, October 1979-March 1980. Report XN-NF-80-26
Technical Report
·
OSTI ID:6730742
The first of three scheduled poolside fuel examinations at the Oyster Creek reactor conducted during February/March 1980, was directed at one of the four symmetrically loaded ENC 8 x 8 lead assemblies that had achieved a burnup of approx. 25,000 MWd/MTU. Forty-five of the fuel rods in assembly UD3-109 were removed and examined. In general, the individual fuel rods were in excellent condition. The average fuel rod diameter continued to decrease during the last cycle was assembly burnup increased from 19,500 to 25,700 MWd/MTU. The creepdown since the beginning of life (BOL) in the center of the fuel rods is about 0.003 in. The fuel rods bore no indication of cladding ridging. Fuel rod growth continued at a linear rate of about 0.02% per GWd/MTU burnup since BOL. Preliminary eddy current test data showed that the cladding was free of significant defects. Visual examination of fuel rods, spacers, and tie plate revealed no unusual conditions. An average assembly burnup of 31,000 MWd/MTU is projected by the end of the next reactor cycle. Calculated plastic strain and internal rod pressure were shown to be within the design limit at that burnup. Licensing approval was obtained for the first extended burnup cycle. A cryogenically cooled germanium gamma scanning system for use at poolside was designed.
- Research Organization:
- Exxon Nuclear Co., Inc., Richland, WA (USA)
- OSTI ID:
- 6730742
- Report Number(s):
- DOE/ET/34006-2
- Country of Publication:
- United States
- Language:
- English
Similar Records
Extended Burnup Demonstration Reactor Fuels Program. Annual progress report, April 1983-March 1984. [BWR]
Poolside examination of gadolinia lead test assemblies after two cycles of irradiation
Hot cell examination of Surry three- and four-cycle 17 x 17 demonstration fuel. Volume 1. Principal results and evaluation
Technical Report
·
Thu Jun 20 00:00:00 EDT 1985
·
OSTI ID:5463188
Poolside examination of gadolinia lead test assemblies after two cycles of irradiation
Technical Report
·
Sat Oct 31 23:00:00 EST 1987
·
OSTI ID:5626941
Hot cell examination of Surry three- and four-cycle 17 x 17 demonstration fuel. Volume 1. Principal results and evaluation
Technical Report
·
Fri Jun 01 00:00:00 EDT 1984
·
OSTI ID:8125183
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
BIG ROCK POINT REACTOR
BURNUP
BWR TYPE REACTORS
DEFORMATION
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL ELEMENTS
FUEL RODS
FUEL SCANNING
GAMMA FUEL SCANNING
GAMMA RADIOGRAPHY
INDUSTRIAL RADIOGRAPHY
INSPECTION
MATERIALS TESTING
NONDESTRUCTIVE TESTING
OYSTER CREEK-1 REACTOR
PERFORMANCE
PHYSICAL RADIATION EFFECTS
POWER REACTORS
RADIATION EFFECTS
REACTOR COMPONENTS
REACTORS
TESTING
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
BIG ROCK POINT REACTOR
BURNUP
BWR TYPE REACTORS
DEFORMATION
ENRICHED URANIUM REACTORS
FUEL ASSEMBLIES
FUEL ELEMENTS
FUEL RODS
FUEL SCANNING
GAMMA FUEL SCANNING
GAMMA RADIOGRAPHY
INDUSTRIAL RADIOGRAPHY
INSPECTION
MATERIALS TESTING
NONDESTRUCTIVE TESTING
OYSTER CREEK-1 REACTOR
PERFORMANCE
PHYSICAL RADIATION EFFECTS
POWER REACTORS
RADIATION EFFECTS
REACTOR COMPONENTS
REACTORS
TESTING
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS