skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Comparison of the hydrothermal stability of simulated spent fuel and borosilicate glass in a basaltic environment

Technical Report ·
OSTI ID:6724391

This report presents the preliminary results of hydrothermal interaction tests on simulated spent fuel and borosilicate glass performed under the direction of the Basalt Waste Isolation Project (BWIP) by contract researchers at Temple University, Arizona State University, and the Basalt Materials Research Laboratory at Rockwell Hanford Operations. Tests were conducted on the following systems: basalt + groundwater, simulated spent fuel + groundwater and simulated spent fuel + groundwater + basalt, and simulated borosilicate glass (PNL 76-68) + groundwater and simulated borosilicate glass (PNL 76-68) + groundwater + basalt. Solution samples were analyzed for pH and over 15 elements, and these concentrations were plotted against run duration. Most concentration curves show a strong initial change within the first 100 to 200 hr and then level off. This gradual leveling suggests that a metastable, steady-state condition has been attained. These preliminary results are insufficient to provide an adequate assessment of the relative performance characteristics of spent fuel and borosilicate glass waste forms in an NWRB. However, as the data base of steady-state (solubility) concentrations of radionuclides is expanded, these values can be coupled with hydrologic flow data to calculate meaningful release rates for individual waste forms in an NWRB and, thus, to compare waste form performance. The tests reported in this document were performed at overstressed conditions to achieve accelerated reaction conditions for demonstrating the long-term performance of waste forms in an NWRB. It is expected that these high-temperatured results will prove to set conservative limits on radionuclide release that may occur at low temperature. Further low-temperature data are being collected to confirm this expectation. 1 figure, 2 tables.

Research Organization:
Rockwell International Corp., Richland, WA (USA). Energy Systems Group
DOE Contract Number:
AC06-77RL01030
OSTI ID:
6724391
Report Number(s):
RHO-BW-SA-253-P; CONF-821205-10; ON: DE83001752
Resource Relation:
Conference: NWTS information meeting on basalt waste isolation project, Las Vegas, NV, USA, 14 Dec 1982
Country of Publication:
United States
Language:
English