EPFL (Swiss) fusion-fission hybrid experiment. Progress report No. 7, May 1, 1983-July 31, 1983
Technical Report
·
OSTI ID:6712684
The principal effort during the three month period May 1, 1983 to July 31, 1983 consisted of setting up a surface source model for the Haefely neutron tube. The main reason for this, as has been pointed out in previous reports, was the complexity of the Haefely neutron tube. The main thrust of the recent work has been towards testing the feasibility of using this patch in generating a source on the surfaces of the Haefely tube. In addition, a few corrections have been made to the results for the 1D and 2D simulation of the Lotus Hybrid blanket-I assembly, presented in the previous report.
- Research Organization:
- Washington Univ., Seattle (USA). Dept. of Nuclear Engineering
- DOE Contract Number:
- AT06-82ER52076
- OSTI ID:
- 6712684
- Report Number(s):
- DOE/ER/52076-8; ON: DE84013794
- Country of Publication:
- United States
- Language:
- English
Similar Records
EPFL (Swiss) Fusion-Fission Hybrid Experiment. Progress report No. 15, August 1, 1985-October 31, 1985
EPFL (Swiss) Fusion-Fission Hybrid Experiment. Progress report No. 11, August 1-October 31, 1984
EPFL (Swiss) fusion-fission hybrid experiment. Progress report No. 8, August 1, 1983-October 31, 1983
Technical Report
·
Tue Dec 31 23:00:00 EST 1985
·
OSTI ID:6218399
EPFL (Swiss) Fusion-Fission Hybrid Experiment. Progress report No. 11, August 1-October 31, 1984
Technical Report
·
Tue Jun 18 00:00:00 EDT 1985
·
OSTI ID:6279631
EPFL (Swiss) fusion-fission hybrid experiment. Progress report No. 8, August 1, 1983-October 31, 1983
Technical Report
·
Wed Nov 30 23:00:00 EST 1983
·
OSTI ID:6731223