BI-GAS Pilot-Plant operation. Quarterly technical progress report, January 1-March 31, 1983
Technical Report
·
OSTI ID:6710858
Work was initiated in January 1983 on reactivation of the BI-GAS pilot plant in preparation for operation with Illinois No. 6 coal. The test program for using Illinois coal was completed for review by the Morgantown Energy Technology Center (METC). Equipment preparations included checking the fuel oil system, cooling water tower, service water system, plant air system, the low pressure boiler and the demineralizer. In addition, a new coal cyclone was ordered as well as pall rings for the H/sub 2/S stripper. A program developed by Stearns-Roger Inc., in Denver for calculating plant mass and energy balances was entered into the Homer City computer. Reactivation of the BI-GAS pilot plant continued through the month of February with approximately fifty percent of the required work being completed. In addition to the reactivation, several projects were initiated or completed including (1) development of an on-line heat and material balance through the data acquisition system for use during actual plant operation, (2) revisions to operation of the slag tap and slag heating burners, (3) a steam desuperheater for the slurry preheater, and (4) a study to convert the BI-GAS gasifier to single-stage operation. Reactivation of the BI-GAS pilot plant proceeded during March 1983 with completion expected in April. The test program for G-20, scheduled for May 1983, was issued along with modifications prior to the test. Calculations were done to determine if the gasifier can be operated at 500 psig. In general, it was found that few plant modifications would be necessary to operate at the lower pressure. 5 figures, 4 tables.
- Research Organization:
- Stearns-Roger, Inc., Denver, CO (USA)
- DOE Contract Number:
- AC21-80ET14705
- OSTI ID:
- 6710858
- Report Number(s):
- DOE/ET/14705-51; ON: DE83014448
- Country of Publication:
- United States
- Language:
- English
Similar Records
BI-GAS coal-gasification program. Final report, November 1979-August 1982. [Tests G10A; G11, A, B, C, D, E, F, G; G12, A; G12, A; G13; G14, A; G15, A; G16, A, B; G17, A, B, C, D, E, F; G18, A, B; G19 A, B]
BI-GAS pilot plant. Quarterly technical progress report, 1 July 1982-30 September 1982
BI-GAS Pilot Plant operation. Quarterly technical progress report, April 1-June 30, 1983
Technical Report
·
Sun Jan 30 23:00:00 EST 1983
·
OSTI ID:6477879
BI-GAS pilot plant. Quarterly technical progress report, 1 July 1982-30 September 1982
Technical Report
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:7025158
BI-GAS Pilot Plant operation. Quarterly technical progress report, April 1-June 30, 1983
Technical Report
·
Fri Dec 31 23:00:00 EST 1982
·
OSTI ID:6662589
Related Subjects
01 COAL, LIGNITE, AND PEAT
010404* -- Coal
Lignite
& Peat-- Gasification
BI-GAS PROCESS
COAL GASIFICATION
DATA
ENERGY BALANCE
EXPERIMENTAL DATA
FUNCTIONAL MODELS
GASIFICATION
INFORMATION
MATERIAL BALANCE
MODIFICATIONS
NUMERICAL DATA
OPERATION
PILOT PLANTS
RESEARCH PROGRAMS
THERMOCHEMICAL PROCESSES
010404* -- Coal
Lignite
& Peat-- Gasification
BI-GAS PROCESS
COAL GASIFICATION
DATA
ENERGY BALANCE
EXPERIMENTAL DATA
FUNCTIONAL MODELS
GASIFICATION
INFORMATION
MATERIAL BALANCE
MODIFICATIONS
NUMERICAL DATA
OPERATION
PILOT PLANTS
RESEARCH PROGRAMS
THERMOCHEMICAL PROCESSES