skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Isolation Pilot Plant RH TRU waste preoperational checkout: Final report

Technical Report ·
OSTI ID:6709254

This report documents the results of the Waste Isolation Pilot Plant (WIPP) Remote-Handled Transuranic (RH TRU) Waste Preoperational Checkout. The primary objective of this checkout was to demonstrate the process of handling RH TRU waste packages, from receipt through emplacement underground, using equipment, personnel, procedures, and methods to be used with actual waste packages. A further objective was to measure operational time lines to provide bases for confirming the WIPP design through put capability and for projecting operator radiation doses. Successful completion of this checkout is a prerequisite to the receipt of actual RH TRU waste. This checkout was witnessed in part by members of the Environmental Evaluation Group (EEG) of the state of New Mexico. Further, this report satisfies a key milestone contained in the Agreement for Consultation and Cooperation with the state of New Mexico. 4 refs., 26 figs., 4 tabs.

Research Organization:
Westinghouse Electric Corp., Carlsbad, NM (USA). Waste Isolation Div.
DOE Contract Number:
AC04-86AL31950
OSTI ID:
6709254
Report Number(s):
DOE/WIPP-88-013; ON: DE89002762
Resource Relation:
Other Information: Paper copy only, copy does not permit microfiche production
Country of Publication:
United States
Language:
English