Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Material control system design: Test Bed Nitrate Storage Area (TBNSA)

Technical Report ·
DOI:https://doi.org/10.2172/6706629· OSTI ID:6706629

This report provides an example of a hypothetical Special Nuclear Material (SNM) Safeguard Material Control and Accounting (MC and A) System which will be used as a subject for the demonstration of the Lawrence Livermore Laboratory MC and A System Evaluation Methodology in January 1978. This methodology is to become a tool in the NRC evaluation of license applicant submittals for Nuclear Fuel Cycle facilities. The starting point for this test bed design was the Allied-General Nuclear Services--Barnwell Nuclear Fuel Plant Reprocessing plant as described in the Final Safety Analysis Report (FSAR), of August 1975. The test bed design effort was limited to providing an SNM safeguard system for the plutonium nitrate storage area of this facility. (DLC)

Research Organization:
California Univ., Livermore (USA). Lawrence Livermore Lab.
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
6706629
Report Number(s):
UCID-17525-77-3
Country of Publication:
United States
Language:
English