Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Projected spent fuel storage requirements

Technical Report ·
DOI:https://doi.org/10.2172/6654413· OSTI ID:6654413
This analysis identifies the post-reactor basin storage capacity requirements between now and 1990 for various combinations of utility actions in order to establish the full range of possible storage requirements. The combined actions of reracking reactor basins, transferring spent fuel within utilities, and relaxing the policy of reserving reactor basin capacity for a full core discharge are insufficient to meet pre-1985 spent fuel storage capacity requirements. Additional storage capacity is required before 1985 for at least 1000 BWR assemblies and 2000 PWR assemblies. Storage capacity must be provided for a minimum of 12,000 BWR assemblies and 7,000 PWR assemblies by 1990. If none of the possible industry actions are taken, additional storage capacity is required for over 23,000 BWR and 17,000 PWR assemblies before 1985 and over 63,000 BWR and 40,000 PWR assemblies by 1990. The amount of spent fuel which would be shipped to a post reactor basin storage facility between 1985 and 1990 depends on whether utilities continue the activities and policies required to meet spent fuel storage requirements before 1985 (no full core reserve, intra-utility fuel shipments) or seek to regain their pre-storage shortage posture (full core reserve capacity, no intra-utility fuel shipments). If utilities take the former approach, storage capacity is required between 1985 and 1990 for approximately 11,000 BWR assemblies and 5,000 PWR assemblies. If the latter philososphy prevails, storage capacity must be provided between 1895 and 1990 for approximately 27,000 BWR assemblies and 23,000 PWR assemblies.
Research Organization:
Battelle Pacific Northwest Labs., Richland, WA (USA)
DOE Contract Number:
EY-76-C-06-1830
OSTI ID:
6654413
Report Number(s):
PNL-2564
Country of Publication:
United States
Language:
English

Similar Records

US reactor spent-fuel storage capabilities
Technical Report · Tue Jun 01 00:00:00 EDT 1982 · OSTI ID:5366796

Taipower's spent fuel interim storage program
Conference · Tue Dec 31 23:00:00 EST 1991 · Transactions of the American Nuclear Society; (United States) · OSTI ID:6118227

Spent fuel storage capacity in new reactors
Technical Report · Fri Nov 30 23:00:00 EST 1979 · OSTI ID:5517264