skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Site inspection of the disposal site near Building 823, Lawrence Livermore National Laboratory Site 300

Technical Report ·
OSTI ID:6644677
;  [1];  [2]
  1. Lawrence Livermore National Lab., CA (USA)
  2. Brown and Caldwell, Pleasant Hill, CA (USA)

This report presents the results of a site inspection performed at a disposal site located approximately 150 ft southwest of Building 823 at Lawrence Livermore National Laboratory (LLNL) Site 300. LLNL is operated for the US Department of Energy by the University of California. The major programs at LLNL have been devoted to the design and testing of nuclear weapons and to magnetic fusion research. Since 1952, LLNL has added other major programs, including applied laser fusion research, laser isotope separation, biomedical and environmental studies, and applied energy technologies. Operations at Site 300 began in 1955. Major programmatic operations at Site 300 include hydrodynamic testing of non-nuclear explosive assemblies, including diagnostic tests; physical, environmental, and dynamic tests; and high explosives (HE) formulation and fabrication. In addition, particle beam research has been conducted at Site 300. Topics include stratigraphy, structure, hydrogeology, and analytical results. 11 refs., 3 figs., 3 tabs.

Research Organization:
Lawrence Livermore National Lab., CA (USA)
Sponsoring Organization:
DOE/DP
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
6644677
Report Number(s):
UCRL-ID-104342; ON: DE90016653
Resource Relation:
Related Information: Environmental Restoration Series
Country of Publication:
United States
Language:
English