skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Quarterly progress report, April 1--June 30, 1978 for study of plutonium oxide leak rates from shipping containers. Interim report

Technical Report ·
OSTI ID:6644342

Progress is reportd in the following tasks: Task C, Measure transmission of UO/sub 2/ powder through leaks (single orifice or capillary experiments and experiments with leakpaths above and below powder level were conducted); Task E, Investigate PuO/sub 2/ leaks through simulated and defected containers (room-temperature simulated crack experiments were conducted at helium flow rates of 11.4, 9.8, 11.6, and 13.2 cc/s). (9 figs, 5 tables) (DLC)

Research Organization:
Battelle Pacific Northwest Labs., Richland, WA (USA)
DOE Contract Number:
EY-76-C-06-1830
OSTI ID:
6644342
Report Number(s):
PNL-3260-7
Country of Publication:
United States
Language:
English