High SO[sub 2] removal efficiency testing
Baseline testing at the base'' site. Tampa Electric Company's (TECo's) Big Bend Station, commenced on September 28 and was completed on October 2. Initial results from this testing were presented in the previous Technical Progress Report, but a more complete discussion is provided in this report. Parametric testing was conducted at the Big Bend site during this quarter to evaluate the effects of dibasic acid (DBA) addition on system SQ removal performance. The parametric tests were conducted from November 2 through 19. A DBA consumption rate test was also conducted, after the parametric tests were completed. The DBA consumption test was conducted from November 21 through 25. Options I and II to the base program were exercised by DOE/PETC at the end of the previous quarter. These options involve testing at Hoosier Energy Rural Electric Cooperative Inc.'s Merom Station and Southwestern Electric Power Company's Pirkey Station, respectively. Testing was conducted at Merom Station during November. Previously, Radian Corporation was the test contractor for EPRI-funded performance additive testing at this site. This EPRI-funded testing involved the equivalent of baseline testing, parametric testing with both DBA and sodium formate performance additives, and an additive consumption test with the DBA additive. The results of the prior testing will be available to support the objectives of this DOE project Consequently, the only testing required at the Merom site was to conduct consumption tests with the sodium formate additive. After a brief baseline repeat test, two sodium formate consumption tests were conducted during the time period from November 11 through 23. Results from the consumption tests are presented and discussed in this report.
- Research Organization:
- Radian Corp., Austin, TX (United States)
- Sponsoring Organization:
- DOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-92PC91338
- OSTI ID:
- 6641335
- Report Number(s):
- DOE/PC/91338-T2; ON: DE93012463
- Country of Publication:
- United States
- Language:
- English
Similar Records
High SO{sub 2} removal efficiency testing. Technical progress report, [October 1--December 31, 1992]
High SO{sub 2} removal efficiency testing. Technical progress report, [1 April--30 June 1993]
High SO(2) Removal Efficiency Testing.
Technical Report
·
Tue Jan 19 23:00:00 EST 1993
·
OSTI ID:10143262
High SO{sub 2} removal efficiency testing. Technical progress report, [1 April--30 June 1993]
Technical Report
·
Thu Jul 15 00:00:00 EDT 1993
·
OSTI ID:10180733
High SO(2) Removal Efficiency Testing.
Technical Report
·
Wed Oct 22 00:00:00 EDT 1997
·
OSTI ID:643539
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200202* -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
ADDITIVES
BUFFERS
CHEMICAL REACTIONS
COMPARATIVE EVALUATIONS
DESULFURIZATION
DOCUMENT TYPES
EFFICIENCY
EVALUATION
FLUE GAS
FOSSIL-FUEL POWER PLANTS
GASEOUS WASTES
LIME-LIMESTONE WET SCRUBBING PROCESSES
ORGANIC ACIDS
ORGANIC COMPOUNDS
POWER PLANTS
PROGRESS REPORT
SCRUBBING
THERMAL POWER PLANTS
WASTES
200202* -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
ADDITIVES
BUFFERS
CHEMICAL REACTIONS
COMPARATIVE EVALUATIONS
DESULFURIZATION
DOCUMENT TYPES
EFFICIENCY
EVALUATION
FLUE GAS
FOSSIL-FUEL POWER PLANTS
GASEOUS WASTES
LIME-LIMESTONE WET SCRUBBING PROCESSES
ORGANIC ACIDS
ORGANIC COMPOUNDS
POWER PLANTS
PROGRESS REPORT
SCRUBBING
THERMAL POWER PLANTS
WASTES