Commissioning of the PEP-II high power RF systems
Conference
·
OSTI ID:663286
- Lawrence Berkeley National Lab., CA (US)
- Stanford Univ., CA (US). Stanford Linear Accelerator Center
The authors describe the commissioning of the high-power RF stations for the PEP-II B factory. This includes in-situ testing and conditioning of components after installation, phasing of cavities within each station and between stations in each ring, capture of first beam, stored-beam operation at low- and moderate-current, commissioning of feedback loops, and high-current operation. Performance of the overall system and of critical components such as klystrons, cavities, windows, tuners and the HOM suppression scheme is reported. Observation of beam motion and signals in the cavity and HOM loads suggest that the HOM impedance reduction necessary for high-current operation has been achieved.
- Research Organization:
- Stanford Univ., Stanford Linear Accelerator Center, CA (US); Lawrence Berkeley National Lab., CA (US)
- Sponsoring Organization:
- USDOE Office of Energy Research, Washington, DC (US)
- DOE Contract Number:
- AC03-76SF00515; AC03-76SF00098
- OSTI ID:
- 663286
- Report Number(s):
- SLAC-PUB--7852; CONF-980671--; ON: DE98059237
- Country of Publication:
- United States
- Language:
- English
Similar Records
RF system design for the PEP-II B Factory
Updated Impedance Estimate of the PEP-II RF Cavity
In Depth Diagnostics for RF System Operation in the PEP-II B Factory
Conference
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:10194040
Updated Impedance Estimate of the PEP-II RF Cavity
Conference
·
Sat Jun 01 00:00:00 EDT 1996
·
OSTI ID:619417
In Depth Diagnostics for RF System Operation in the PEP-II B Factory
Conference
·
Fri May 27 00:00:00 EDT 2005
·
OSTI ID:890793