Coal mining cost model. Volume 3. Surface coal mining cost model. Final report
The revised EPRI coal mining cost models represent a computerized process engineering approach to the analysis of production costs and mining requirements of either surface or underground mining projects. The models estimate all capital and operating costs typically associated with the preproduction and production phases of a coal mining project, and may be applied either to existing mines or to proposed mine openings. The models are an updated and computerized version of the original EPRI Coal Mining Cost Models (EA-437, Vols, 1 and 2). Data bases have been expanded and now reflect a mid-1980 base year for cost items. The process engineering costing procedure has been improved and an entirely new financial analysis procedure has been developed (P and L statement approach) offering many new financial options to the model user. The models have been designed for use by a variety of technical disciplines ranging from resource planners to mining practicioners. The input parameters have, therefore, been structured to reflect varying degrees of familiarity with mining and cost analysis procedures. Three levels of input parameters are used in the models, -required, default, and override categories. The category identifies the minimum information required to initiate a model run including basic parameter information describing the physical, operating, and financial aspects of the project.
- Research Organization:
- NUS Corp., Rockville, MD (USA)
- OSTI ID:
- 6628510
- Report Number(s):
- EPRI-EA-1273(Vol.3)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal mining cost model. Volume 4. Users' guide for the surface coal mining cost model
Coal mining cost mode. Volume 2. Users' guide for the underground coal mining cost model. Final report
Coal mining cost model. Volume 1. Underground coal mining cost model. Final report. [Mathematical models]
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6651931
Coal mining cost mode. Volume 2. Users' guide for the underground coal mining cost model. Final report
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6897240
Coal mining cost model. Volume 1. Underground coal mining cost model. Final report. [Mathematical models]
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6610139
Related Subjects
01 COAL, LIGNITE, AND PEAT
012000* -- Coal
Lignite
& Peat-- Mining
29 ENERGY PLANNING, POLICY, AND ECONOMY
294001 -- Energy Planning & Policy-- Coal
COAL MINES
COAL MINING
COST
ECONOMIC ANALYSIS
ECONOMICS
EQUIPMENT
MANPOWER
MATHEMATICAL MODELS
MINES
MINING
MINING EQUIPMENT
SIZE
SURFACE MINING
012000* -- Coal
Lignite
& Peat-- Mining
29 ENERGY PLANNING, POLICY, AND ECONOMY
294001 -- Energy Planning & Policy-- Coal
COAL MINES
COAL MINING
COST
ECONOMIC ANALYSIS
ECONOMICS
EQUIPMENT
MANPOWER
MATHEMATICAL MODELS
MINES
MINING
MINING EQUIPMENT
SIZE
SURFACE MINING