A level playing field: Obtaining consistent cost estimates for advanced reactor designs

Conference ·
OSTI ID:6615965
Rules and guidelines for developing cost estimates are given which provide a means for presenting cost estimates for advanced concepts on a consistent and equitable basis. For advanced reactor designs, the scope of a cost estimate includes the plant capital cost, the operating and maintenance cost, the fuel cycle cost, and the cost of decommissioning. Each element is subdivided as is necessary to provide a common reporting format for all power plant concepts. The total generation cost is taken to be a suitable choice for a summary figure of merit. To test the application of the rules and guidelines as well as developing reference costs for current technologies, several different sized coal and pressurized water reactor plant cost estimates have been prepared. (LEW)
Research Organization:
Oak Ridge National Lab., TN (USA); USDOE, Washington, DC
DOE Contract Number:
AC05-84OR21400
OSTI ID:
6615965
Report Number(s):
CONF-870415-1; ON: DE87007368
Country of Publication:
United States
Language:
English