Quality assurance plan for the High Level Controller for the CBMS Block II
This document establishes the software Quality Assurance Plan (QAP) for the High Level Controller for the Chemical and Biological Mass Spectrometer Block II (HLC/CBMS-II) project activities under the Computing, Robotics, and Education (CRE) Directorate management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The CBMS Program was awarded to ORNL by the US Army Chemical and Biological Defense command, Aberdeen Proving Ground, Maryland, to design the next version (Block II) mass spectrometer for the detection and identification of chemical and biological warfare agents, to fabricate four engineering prototypes, and to construct eight preproduction units. Section 1 of this document provides an introduction to the HLC/CBMS-II project QAP. Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the project. Section 4 reviews the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur; therefore, the matrix will be reviewed and revised on a periodic basis. Appendix B shows the quality assurance criteria of the DOE Order 5700.6C and their applicability to this project.
- Research Organization:
- Oak Ridge National Lab., TN (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States); Department of Defense, Washington, DC (United States)
- DOE Contract Number:
- AC05-96OR22464
- OSTI ID:
- 661393
- Report Number(s):
- ORNL/TM--13412; ON: DE98054803
- Country of Publication:
- United States
- Language:
- English
Similar Records
Quality assurance plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project
Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)
Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2
Technical Report
·
Thu Oct 31 23:00:00 EST 1996
·
OSTI ID:416981
Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)
Technical Report
·
Thu May 22 00:00:00 EDT 1997
·
OSTI ID:10148710
Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2
Technical Report
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1193785