Conclusions regarding geotechnical acceptability of the WIPP site

Conference ·
OSTI ID:6599985
The Waste Isolation Pilot Plant (WIPP) was authorized by Congress in 1980 as an unlicensed research and development (R and D) facility to demonstrate the safe disposal of radioactive wastes arising from the defense activities and programs of the United States. WIPP is now being constructed in southeast New Mexico, using salt beds about 655 m below the surface of the ground. Construction of the full WIPP facility will not commence until a preliminary underground excavation phase, called Site and Preliminary Design Validation (SPDV), is satisfactorily concluded in the summer of 1983. This SPDV program permits confirmation of subsurface geology, in drifts at planned facility depth that extend for 1555 m in a north-south direction, and in the two vertical shafts that provide access to these drifts. The subsurface studies are nearing completion, and it is therefore appropriate to draw conclusions regarding the geotechnical acceptability of the WIPP site. Four geotechnical elements are discussed: dissolution, deformation, hydrologic regime, and natural resources.
Research Organization:
Sandia National Labs., Albuquerque, NM (USA)
DOE Contract Number:
AC04-76DP00789
OSTI ID:
6599985
Report Number(s):
SAND-83-0226C; CONF-830205-5; ON: DE83006483
Country of Publication:
United States
Language:
English