Phase 2 fire hazard analysis for the canister storage building
The fire hazard analysis assesses the risk from fire in a facility to ascertain whether the fire protection policies are met. This document provides a preliminary FHA for the CSB facility. Open items have been noted in the document. A final FHA will be required at the completion of definitive design, prior to operation of the facility.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 657832
- Report Number(s):
- WHC-SD-SNF-FHA--002-Rev.1; ON: DE98057380; BR: EW3135040
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fire hazard analysis for the fuel supply shutdown storage buildings
Fire hazards analysis for W030 tank farm ventilation upgrade
Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility
Technical Report
·
Wed Sep 27 00:00:00 EDT 2000
·
OSTI ID:804805
Fire hazards analysis for W030 tank farm ventilation upgrade
Technical Report
·
Wed Jul 17 00:00:00 EDT 1996
·
OSTI ID:657373
Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility
Technical Report
·
Wed Sep 06 00:00:00 EDT 2000
·
OSTI ID:804822