Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Signal validation in nuclear power plants: Progress report No. 7

Technical Report ·
OSTI ID:6571656
This report summarizes the progress in the US Department of Energy sponsored project on Signal Validation for Nuclear Power Plants for the period September--December, 1988. The annual report for the period September 30, 1987--September 29, 1988, was submitted to the US Department of Energy. Several papers, related to the work performed under the project, have been presented at the ANS/ENS International Conference, Washington, DC and at the IEEE Conference on Decision and Control, Austin, Texas. Two sets of EBR-II data base have been acquired and are being used for testing the integrated signal validation system. A preliminary demonstration of the integrated signal validation system is operational in the Micro VAX-II workstation. 12 figs.
Research Organization:
Tennessee Univ., Knoxville (USA). Dept. of Nuclear Engineering
DOE Contract Number:
AC02-86NE37959
OSTI ID:
6571656
Report Number(s):
DOE/NE/37959-25; ON: DE89004740
Country of Publication:
United States
Language:
English