Title: Utility advanced turbine systems (ATS) technology readiness testing. Technical progress report, January 1--March 31, 1998

Technical Report ·
DOI:https://doi.org/10.2172/656823· OSTI ID:656823

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE`s request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. This report summarizes work accomplished in 1Q98.

Research Organization:
General Electric Co., Schenectady, NY (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States); USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
DOE Contract Number:
FC21-95MC31176
OSTI ID:
656823
Report Number(s):
DOE/MC/31176-17; ON: DE98058027; BR: AB0560000; ED1901000; TRN: AHC29817%%382
Resource Relation:
Other Information: PBD: [1998]
Country of Publication:
United States
Language:
English

Similar Records

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING
Technical Report · Thu Apr 01 00:00:00 EST 1999 · OSTI ID:656823

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING
Technical Report · Fri Oct 01 00:00:00 EDT 1999 · OSTI ID:656823

Utility advanced turbine systems (ATS) technology readiness testing
Technical Report · Fri Sep 15 00:00:00 EDT 2000 · OSTI ID:656823