Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary concepts: coordinated safeguards for materials management in a thorium--uranium fuel reprocessing plant

Technical Report ·
DOI:https://doi.org/10.2172/6536546· OSTI ID:6536546
This report addresses preliminary concepts for coordinated safeguards materials management in a typical generic thorium--uranium-fueled light-water reactor (LWR) fuels reprocessing plant. The reference facility is designed to recover thorium and uranium from first-generation (denatured /sup 235/U) startup fuels, first-recycle and equilibrium (denatured /sup 233/U) thorium--uranium LWR fuels, and to recover the plutonium generated in the /sup 238/U denaturant as well. 12 figures, 3 tables.
Research Organization:
Los Alamos Scientific Lab., NM (USA)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
6536546
Report Number(s):
LA-7411-MS
Country of Publication:
United States
Language:
English