skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: System design description for the CPDF Cascade Control Room: SDD-7

Technical Report ·
OSTI ID:6502230

The Cascade Control Room (CCR) is the nerve center of the Centrifuge Plant Demonstration Facility (CPDF). The components within the CCR monitor and control those variables necessary for the safe and efficient operation of the cascade during normal and emergency operation. The CCR interfaces with all the process systems and most of the support systems, receiving and transmitting data signals at frequent intervals during all phases of cascade operation. The main component in the CCR is the control room computer (CRC), which serves as the primary interface between the CCR and the process and support systems. The other components in the CCR are: (1) instrumentation cabinets; (2) operator control panel; (3) mass spectrometer - tails (MST); (4) mass spectrometer - product (MSP); (5) product light gas analyzer (PLGA); and (6) the operator. CCR instrumentation provides audible and visual alarms of abnormal events detected by process and utilities instrumentation or by the CRC. Records of alarms and process and utility variables are continuously generated in the CCR. Operator control functions are performed through the CRC or at the various instrument cabinets. Analysis of the current operating status of the plant is aided by the CRC and CCR instrumentation. 14 figs., 2 tabs.

Research Organization:
Science Applications, Inc., Oak Ridge, TN (USA); Oak Ridge Gaseous Diffusion Plant, TN (USA)
DOE Contract Number:
AC05-84OT21400
OSTI ID:
6502230
Report Number(s):
K/TS-11-866; ON: DE87010077
Resource Relation:
Other Information: Paper copy only, copy does not permit microfiche production
Country of Publication:
United States
Language:
English