Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee
The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment.
- Research Organization:
- Oak Ridge National Lab., TN (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Management and Administration, Washington, DC (United States); USDOE Assistant Secretary for Human Resources and Administration, Washington, DC (United States)
- DOE Contract Number:
- AC05-84OR21400
- OSTI ID:
- 650164
- Report Number(s):
- ORNL/ER--424; ON: DE98004261
- Country of Publication:
- United States
- Language:
- English
Similar Records
Treatability Study Operational Testing Program and Implementation Plan for the Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee
Project health and safety plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Evaluation of phase 1 and phase 2 sampling and analysis data for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Technical Report
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:435305
Project health and safety plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Technical Report
·
Mon Mar 31 23:00:00 EST 1997
·
OSTI ID:463597
Evaluation of phase 1 and phase 2 sampling and analysis data for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Technical Report
·
Thu Feb 29 23:00:00 EST 1996
·
OSTI ID:226022