Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Task 3.17 -- Hot-gas cleanup. Semi-annual report, July 1--December, 31, 1996

Technical Report ·
DOI:https://doi.org/10.2172/650111· OSTI ID:650111

The programmatic goal in advanced power systems will be to develop advanced methods for gas stream cleanup in combustion and gasification systems, using in situ and back-end technologies. The characteristics of the fuel, its ash, and sorbents will be evaluated to determine their impact on overall performance, including the reduction of gas stream contaminants. Objectives for the work to be performed under this subtask include the following: identifying effective means for hot-gas cleanup and testing in-bed sorbents for accomplishing 99% alkali capture as well as effective capture of sulfur and chlorine during PFBC; developing catalysts and effective operating ranges for removing tar from gasification process streams. Accomplishments to date and conclusions from the literature survey, thermogravimetric testing, and bench-scale testing on the capture of alkali during PFBC using in-bed sorbents are described. In addition Englehard EMcat Elite S-3699 was tested for its ability to crack coal tar produced during steam gasification of bituminous coal. Preliminary results are described.

Research Organization:
North Dakota Univ., Energy and Environmental Research Center, Grand Forks, ND (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
DOE Contract Number:
FC21-93MC30097
OSTI ID:
650111
Report Number(s):
DOE/MC/30097--5588; ON: DE97002235
Country of Publication:
United States
Language:
English

Similar Records

Task 3.12 -- Small power systems. Semi-annual report, January 1--June 30, 1995
Technical Report · Fri Aug 01 00:00:00 EDT 1997 · OSTI ID:634172

Gas stream cleanup
Technical Report · Wed Aug 01 00:00:00 EDT 1990 · OSTI ID:5981789

Task 3.9 -- Catalytic tar cracking. Semi-annual report, January 1--June 30, 1995
Technical Report · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:650108