Wm. H. Zimmer Nuclear Power Station control room design review/audit technical evaluation report
As part of the NRC staff actions following the TMI-2 accident (Item I.D.1, NUREG-0660, Vol. 1, May 1980) (ref. 1), it is required that all licensees and applicants for operating licenses conduct a Detailed Control Room Design Review (DCRDR) to identify and correct human factors design deficiencies. These DCRDRs will be initiated after final issuance of NUREG-0700, Guidelines for Control Room Design Review (ref. 3), and will be completed within one year. Those applicants for operating licenses who are unable to complete this DCRDR prior to fuel loading are required to conduct a preliminary design assessment of their control rooms, identify human factors deficiencies, and establish a schedule, approved by NRC, for correcting the deficiencies.
- Research Organization:
- Lawrence Livermore National Lab., CA (USA)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 6496355
- Report Number(s):
- UCID-18971; ON: TI85016702
- Country of Publication:
- United States
- Language:
- English
Similar Records
Experience in the review of utility control room design review and safety parameter display system programs
Human factors engineering control room design review/audit report: Grand Gulf Nuclear Station Unit 1, Mississippi Power and Light Company
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
ZIMMER-1 REACTOR
CONSOLES
CONTROL ROOMS
DISPLAY DEVICES
ZIMMER-2 REACTOR
AUDITS
CONTROL EQUIPMENT
DESIGN
ENVIRONMENTAL ENGINEERING
HUMAN FACTORS
REACTOR CONTROL SYSTEMS
REACTOR INSTRUMENTATION
BWR TYPE REACTORS
CONTROL SYSTEMS
ENGINEERING
ENRICHED URANIUM REACTORS
EQUIPMENT
POWER REACTORS
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
220400* - Nuclear Reactor Technology- Control Systems
210100 - Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled