Demonstration plant engineering and design. Phase I: the pipeline gas demonstration plant. Volume 7. Plant Section 500 - shift/methanation
Technical Report
·
OSTI ID:6496310
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the completion of the process design and the project engineering design of the Demonstration Plant. A report of the design effort is being issued in 24 volumes. This is Volume 7 which reports the design of Plant Section 500 - Shift/Methanation. The shift/methanation process is used to convert the purified synthesis gas from the Rectisol unit (Plant Section 400) into the desired high-Btu SNG product. This is accomplished in a series of fixed-bed adiabatic reactors. Water is added to the feed gas to the reactors to effect the requisite reactions. A nickel catalyst is used in the shift/methanation process, and the only reaction products are methane and carbon dioxide. The carbon dioxide is removed from the SNG in Plant Sectin 600 - CO/sub 2/ Removal. After carbon dioxide removal from the SNG, the SNG is returned to Plant Section 500 for final methanation. The product from the final methanation reactor is an SNG stream having a gross heating value of approximately 960 Btu per standard cubic foot. The shift/methanation unit at design conditions produces 19 Million SCFD of SNG from 60 Million SCFD of purified synthesis gas.
- Research Organization:
- Conoco, Inc., Stamford, CT (USA); Foster Wheeler Energy Corp., Livingston, NJ (USA)
- DOE Contract Number:
- AC01-77ET13060
- OSTI ID:
- 6496310
- Report Number(s):
- DOE/ET/13060-T3(Vol.7); FE-2542-38(Vol.7); ON: DE81025190
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pipeline Gas Demonstration Plant: Phase I. Demonstration Plant Engineering and Design. Volume 6, Plant Section 400, Rectisol
Demonstration plant engineering and design. Phase I. The pipeline gas demonstration plant. Volume 8. Plant Section 600: CO/sub 2/ removal
Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design. Volume 1. Executive summary
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6495864
Demonstration plant engineering and design. Phase I. The pipeline gas demonstration plant. Volume 8. Plant Section 600: CO/sub 2/ removal
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6376500
Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design. Volume 1. Executive summary
Technical Report
·
Mon Jun 01 00:00:00 EDT 1981
·
OSTI ID:6225062
Related Subjects
01 COAL, LIGNITE, AND PEAT
010404* -- Coal
Lignite
& Peat-- Gasification
CALORIFIC VALUE
CARBON COMPOUNDS
CARBON DIOXIDE
CARBON OXIDES
CATALYSTS
CATALYTIC EFFECTS
CHALCOGENIDES
CHEMICAL REACTIONS
COAL GASIFICATION
COAL GASIFICATION PLANTS
COMBUSTION PROPERTIES
CRG PROCESSES
DEMONSTRATION PLANTS
DESIGN
DIAGRAMS
ELEMENTS
ENGINEERING
FLOWSHEETS
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GASES
GASIFICATION
HIGH BTU GAS
INDUSTRIAL PLANTS
LURGI SLAGGING PROCESS
METALS
METHANATION
NICKEL
OXIDES
OXYGEN COMPOUNDS
REMOVAL
SHIFT PROCESSES
THERMOCHEMICAL PROCESSES
TRANSITION ELEMENTS
010404* -- Coal
Lignite
& Peat-- Gasification
CALORIFIC VALUE
CARBON COMPOUNDS
CARBON DIOXIDE
CARBON OXIDES
CATALYSTS
CATALYTIC EFFECTS
CHALCOGENIDES
CHEMICAL REACTIONS
COAL GASIFICATION
COAL GASIFICATION PLANTS
COMBUSTION PROPERTIES
CRG PROCESSES
DEMONSTRATION PLANTS
DESIGN
DIAGRAMS
ELEMENTS
ENGINEERING
FLOWSHEETS
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GASES
GASIFICATION
HIGH BTU GAS
INDUSTRIAL PLANTS
LURGI SLAGGING PROCESS
METALS
METHANATION
NICKEL
OXIDES
OXYGEN COMPOUNDS
REMOVAL
SHIFT PROCESSES
THERMOCHEMICAL PROCESSES
TRANSITION ELEMENTS