Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Performance advantages of a gas-stream MHD retrofit

Conference ·
OSTI ID:6486236
Retrofitting existing power plants with an open-cycle MHD system has been re-examined in light of recent developments in the technology of MHD steam-bottoming plants. A new retrofit-cycle configuration has been examined, which provides for a direct gas-gas coupling. With this arrangement, the MHD-topping plant can be decoupled so that the existing plant can be operated either with the MHD cycle or separately. When applied to Vermilion Station Boiler No. 1, a coal-fired power plant presently in operation in Illinois, the retrofit concept produces substantial increases in overall-plant efficiency, total electrical output, and cost effectiveness.
Research Organization:
Argonne National Lab., IL (USA)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
6486236
Report Number(s):
CONF-820814-38; ON: DE83008644
Country of Publication:
United States
Language:
English