Influence of reactor maintenance considerations on the design of a commercial EBT power plant
Conference
·
· Proc. Symp. Eng. Probl. Fusion Res.; (United States)
OSTI ID:6482469
An analysis of the scheduled reactor maintenance requirements of an Elmo Bumpy Torus Reactor (EBTR) and their effect on the reactor and reactor-building design was performed. The requirements for scheduled maintenance are that blanket replacement be accomplished in less time than that required for annual scheduled balance-of-plant maintenance (28 days), that capital and operating costs be minimized and availability maximized. Three circular reactor-building concepts were evaluated: a reactor building with permanent space outboard of the reactor for maintenance operations; a building with permanent maintenance space above the reactor; and a mobile maintenance module concept where the module moves around the perimeter of the reactor building and provides temporary space for maintenance at the required location. This paper presents the rationale for selection. of the first option. Time estimates and equipment requirements for first-wall/blanket/shield (FWBS) replacement are presented.
- Research Organization:
- McDonnell Douglas Astronaut Co, St. Louis, MO, USA
- OSTI ID:
- 6482469
- Report Number(s):
- CONF-811040-
- Conference Information:
- Journal Name: Proc. Symp. Eng. Probl. Fusion Res.; (United States)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Studies of fusion product confinement and heating in EBT reactors
Economic analysis of EBT reactor
Toroidal magnet system conceptual design for the ELMO Bumpy Torus Reactor
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Proc. Symp. Eng. Probl. Fusion Res.; (United States)
·
OSTI ID:6363882
Economic analysis of EBT reactor
Conference
·
Fri Dec 31 23:00:00 EST 1976
·
OSTI ID:5332356
Toroidal magnet system conceptual design for the ELMO Bumpy Torus Reactor
Conference
·
Fri Dec 31 23:00:00 EST 1976
·
OSTI ID:7284718
Related Subjects
70 PLASMA PHYSICS AND FUSION TECHNOLOGY
700200* -- Fusion Energy-- Fusion Power Plant Technology
BREEDING BLANKETS
CONSTRUCTION
DESIGN
ELMO BUMPY TORUS
ELMO DEVICES
EQUIPMENT
FIRST WALL
MAGNETIC MIRRORS
MAINTENANCE
OPEN PLASMA DEVICES
POWER PLANTS
REACTOR COMPONENTS
SHIELDS
THERMONUCLEAR DEVICES
THERMONUCLEAR POWER PLANTS
THERMONUCLEAR REACTOR WALLS
700200* -- Fusion Energy-- Fusion Power Plant Technology
BREEDING BLANKETS
CONSTRUCTION
DESIGN
ELMO BUMPY TORUS
ELMO DEVICES
EQUIPMENT
FIRST WALL
MAGNETIC MIRRORS
MAINTENANCE
OPEN PLASMA DEVICES
POWER PLANTS
REACTOR COMPONENTS
SHIELDS
THERMONUCLEAR DEVICES
THERMONUCLEAR POWER PLANTS
THERMONUCLEAR REACTOR WALLS