skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Superfund Explanation of Significant Difference for the Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area, Silver Bow and Deer Lodge, MT, August 31, 1998

Technical Report ·
OSTI ID:6481843

This document presents an Explanation of Significant Differences from the Record of Decision (ROD) for one Streamside Tailings Operable Unit (SSTOU) of the Silver Bow Creek/Butte Area National Priorities List (NPL) Site. The significant differences discussed in this ESD are: An increase in the volume of tailings/impacted soil in the operable unit; Modifications to the alignment of Silver Bow Creek and the channel profile (i.e., elevation profile); Use of a temporary stream diversion during and after construction to facilitate dewatering and excavation of near-stream tailings and to enhance floodplain and streambank revegetation efforts; Changes in the criteria for in-stream sediment removal as a result of other design changes; Modifications to the mine waste relocation repository (MWRR) design; The inclusion of sediment basins to contain contaminated overland flow run-on from off-site mine waste sources; Elimination of treatment wetlands as the end land use in Subarea 1; Changes in the estimated schedule to implement the SSTOU remedy; and An increase in the estimated cost of the SSTOU remedy.

Research Organization:
Environmental Protection Agency, Office of Emergency and Remedial Response, Washington, DC (United States)
OSTI ID:
6481843
Report Number(s):
PB-98-963125/XAB; EPA-541-R98-116
Resource Relation:
Other Information: See also PB96-964402
Country of Publication:
United States
Language:
English