Superfund Explanation of Significant Difference for the Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area, Silver Bow and Deer Lodge, MT, August 31, 1998
Technical Report
·
OSTI ID:6481843
This document presents an Explanation of Significant Differences from the Record of Decision (ROD) for one Streamside Tailings Operable Unit (SSTOU) of the Silver Bow Creek/Butte Area National Priorities List (NPL) Site. The significant differences discussed in this ESD are: An increase in the volume of tailings/impacted soil in the operable unit; Modifications to the alignment of Silver Bow Creek and the channel profile (i.e., elevation profile); Use of a temporary stream diversion during and after construction to facilitate dewatering and excavation of near-stream tailings and to enhance floodplain and streambank revegetation efforts; Changes in the criteria for in-stream sediment removal as a result of other design changes; Modifications to the mine waste relocation repository (MWRR) design; The inclusion of sediment basins to contain contaminated overland flow run-on from off-site mine waste sources; Elimination of treatment wetlands as the end land use in Subarea 1; Changes in the estimated schedule to implement the SSTOU remedy; and An increase in the estimated cost of the SSTOU remedy.
- Research Organization:
- Environmental Protection Agency, Office of Emergency and Remedial Response, Washington, DC (United States)
- OSTI ID:
- 6481843
- Report Number(s):
- PB-98-963125/XAB; EPA--541-R98-116
- Country of Publication:
- United States
- Language:
- English
Similar Records
Superfund record of decision (EPA Region 8): Silver Bow Creek/Butte Area, Streamside Tailings operable unit, MT, November 29, 1995
Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area, MT. (Second remedial action), June 1992. Interim report
Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area NPL site, Warm Springs Ponds Operable Unit, Upper Clark Fork River Basin, MT. (First remedial action), September 1990
Technical Report
·
Thu Feb 29 23:00:00 EST 1996
·
OSTI ID:241312
Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area, MT. (Second remedial action), June 1992. Interim report
Technical Report
·
Tue Jun 30 00:00:00 EDT 1992
·
OSTI ID:5776636
Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area NPL site, Warm Springs Ponds Operable Unit, Upper Clark Fork River Basin, MT. (First remedial action), September 1990
Technical Report
·
Fri Sep 28 00:00:00 EDT 1990
·
OSTI ID:5201448
Related Subjects
54 ENVIRONMENTAL SCIENCES
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
540350 -- Environment
Aquatic-- Site Resource & Use Studies-- (1990-)
ARSENIC
CADMIUM
CONTROL
COPPER
DEVELOPED COUNTRIES
ELEMENTS
LAWS
METALS
MONTANA
NORTH AMERICA
POLLUTION CONTROL
POLLUTION LAWS
REMEDIAL ACTION
SEDIMENTS
SEMIMETALS
SOILS
TRANSITION ELEMENTS
US SUPERFUND
USA
ZINC
540250* -- Environment
Terrestrial-- Site Resource & Use Studies-- (1990-)
540350 -- Environment
Aquatic-- Site Resource & Use Studies-- (1990-)
ARSENIC
CADMIUM
CONTROL
COPPER
DEVELOPED COUNTRIES
ELEMENTS
LAWS
METALS
MONTANA
NORTH AMERICA
POLLUTION CONTROL
POLLUTION LAWS
REMEDIAL ACTION
SEDIMENTS
SEMIMETALS
SOILS
TRANSITION ELEMENTS
US SUPERFUND
USA
ZINC