SALM installations in Santa Barbara channel
Conference
·
· Soc. Pet. Eng. AIME, Pap.; (United States)
OSTI ID:6471384
The installation of the first single anchor leg mooring (SALM) in United States waters was completed during October 1980 off the coast of California. This SALM forms the vital link between the Hondo Platform, located in 850 ft of water in the Santa Barbara Channel, and an offshore storage and treating vessel moored to the SALM 8,500 ft from the platform. The main emphasis of this paper is on the loadout and water phase construction of the SALM. A brief description of the physical features, design criteria and fabrication of the SALM components is also included. Oil and gas production has been underway in Exxon's Hondo Field since April 1981. Refs.
- Research Organization:
- Exxon Co, USA
- OSTI ID:
- 6471384
- Report Number(s):
- CONF-811023-
- Conference Information:
- Journal Name: Soc. Pet. Eng. AIME, Pap.; (United States)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hondo field development and operations
Construction of the Hondo Field pipeline by the reverse J-tube procedure
Santa Barbara Salm. a prototype deepwater production riser and floating production system
Conference
·
Sun May 01 00:00:00 EDT 1983
· Offshore Technol. Conf.; (United States)
·
OSTI ID:5467496
Construction of the Hondo Field pipeline by the reverse J-tube procedure
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Soc. Pet. Eng. AIME, Pap.; (United States)
·
OSTI ID:6222053
Santa Barbara Salm. a prototype deepwater production riser and floating production system
Conference
·
Sat Dec 31 23:00:00 EST 1977
· Proc., Annu. Offshore Technol. Conf.; (United States)
·
OSTI ID:6608076