Evaluation of nondestructive examination requirement changes with updates of Section XI, Division 1 of the ASME Code

Technical Report ·
OSTI ID:6470842

Present NRC Regulations require that inservice inspection plans for operating plants be updated at the end of each ten-year inspection interval. These plans must comply with the latest edition and addenda of Division 1 rules of Section XI, ''Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the ASME Boiler and Pressure Vessel Code (ASME Code) that is in effect 12 months prior to the required plan update date. The major objective of this study (Task 17 of FIN A6367) was to summarize benefits of nondestructive examination (NDE) methodology in later ASME Code editions and addenda, and to determine if expeditious implementation of these changes should be recommended. Changes in NDE requirements with updates of the ASME Code were analyzed and several improvements in later editions and addenda are discussed. It is concluded that use of the later ASME Code editions and addenda would enhance examination effectiveness. Thus, early implementation of NDE improvements in later editions and addenda is recommended. A compilation of ASME Code editions and addenda being followed and inservice inspection plan update schedules for operating plants is presented. Steps in implementing changed NDE rules are given and methods for accelerating the implementation schedule are proposed.

Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
6470842
Report Number(s):
EGG-SD-6893; ON: TI86004129
Country of Publication:
United States