Reload design process at Yankee Atomic Electric Company
Yankee Atomic Electric Company (YAEC) performs reload design and licensing for their nuclear power plants: Yankee Rowe, Maine Yankee, and Vermont Yankee. Significant savings in labor and computer costs have been achieved in the reload design process by the use of the SIMULATE nodal code using the CASMO assembly burnup code or LEOPARD pin cell burnup code inputs to replace the PDQ diffusion theory code in many required calculations for the Yankee Rowe and Maine Yankee pressurized water reactors (PWRs). An efficient process has evolved for the design of reloads for the Vermont Yankee boiling water reactor (BWR). Due to the major differences in the core design of the three plants, different reload design processes have evolved for each plant.
- Research Organization:
- Yankee Atomic Electric Co., Framingham, MA
- OSTI ID:
- 6463008
- Report Number(s):
- CONF-860610-; TRN: 87-021267
- Journal Information:
- Trans. Am. Nucl. Soc.; (United States), Vol. 52; Conference: American Nuclear Society annual meeting, Reno, NV, USA, 15 Jun 1986
- Country of Publication:
- United States
- Language:
- English
Similar Records
CASMO-2 Spent-Fuel-Rack Criticality Analysis
Experience with gadolinium at yankee
Related Subjects
MAINE YANKEE REACTOR
FUEL MANAGEMENT
REACTOR PHYSICS
ROWE YANKEE REACTOR
VERMONT YANKEE REACTOR
BURNUP
C CODES
DESIGN
DISCRETE ORDINATE METHOD
FUEL ASSEMBLIES
REACTIVITY
REACTOR CORES
REACTOR LICENSING
REACTOR SHUTDOWN
S CODES
BWR TYPE REACTORS
COMPUTER CODES
ENRICHED URANIUM REACTORS
LICENSING
PHYSICS
POWER REACTORS
PWR TYPE REACTORS
REACTOR COMPONENTS
REACTORS
SHUTDOWNS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled