Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Los Alamos National Laboratory Site Integrated Management plan, uranium 233 storage and disposition. Volume 1: Project scope and description

Technical Report ·
DOI:https://doi.org/10.2172/645572· OSTI ID:645572
This Site Integration Management plan provides the Los Alamos Response to the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-1. This recommendation addresses the safe storage and management of the Departments uranium 233 ({sup 233}U) inventory. In the past, Los Alamos has used {sup 233}U for a variety of different weapons related projects. The material was used at a variety of sites in varying quantities. Now, there is a limited need for this material and the emphasis has shifted from use to storage and disposition of the material. The Los Alamos program to address the DNFSB Recommendation 97-1 has two emphases. First, take corrective action to address near term deficiencies required to provide safe interim storage of {sup 233}U. Second, provide a plan to address long term storage and disposition of excess inventory at Los Alamos.
Research Organization:
Los Alamos National Lab., NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
645572
Report Number(s):
LA-UR--98-4883; ON: DE98004321
Country of Publication:
United States
Language:
English

Similar Records

Skeletons in the closet: Implementation of the packaging program at Los Alamos
Conference · Fri Oct 31 23:00:00 EST 1997 · OSTI ID:292808

Production of U-233 metal at Los Alamos and Oak Ridge
Technical Report · Sun Apr 17 23:00:00 EST 1955 · OSTI ID:10146887

Plutonium research in the DNFSB 94-1 core technology program
Journal Article · Tue Sep 01 00:00:00 EDT 1998 · Transactions of the American Nuclear Society · OSTI ID:644245