Solomon Gulch hydroelectric project takes shape
Journal Article
·
· Alaska Constr. Oil; (United States)
OSTI ID:6454580
The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)
- OSTI ID:
- 6454580
- Journal Information:
- Alaska Constr. Oil; (United States), Vol. 19:12
- Country of Publication:
- United States
- Language:
- English
Similar Records
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
Power Authority calls for wise investment in hydropower
Success story: Department of Energy small hydroelectric loan program
Technical Report
·
Thu Mar 01 00:00:00 EST 1979
·
OSTI ID:6454580
Power Authority calls for wise investment in hydropower
Journal Article
·
Tue Jan 01 00:00:00 EST 1980
· Alaska Constr. Oil; (United States)
·
OSTI ID:6454580
Success story: Department of Energy small hydroelectric loan program
Conference
·
Thu Jan 01 00:00:00 EST 1981
·
OSTI ID:6454580