Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fuel rod welding (LWBR development program)

Technical Report ·
OSTI ID:6449179
Procedures were developed to weld both ends of approximately 25,000 fuel rods for the Light Water Breeder Reactor (LWBR) core. The rods were welded using the gas tungsten arc (GTA) method in high-purity helium at 1 atmosphere. Welding parameters, including weld current, arc gap, and speed of rotation, were established to control the size of the weld. Electrode and chill positioning with respect to the endclosure/tube joint controlled the location of the weld. Weld quality of the fuel rods was ensured by 100-percent nondestructive testing by ultrasonic and radiographic inspection and the destructive evaluation of process control samples in each weld lot.
Research Organization:
Bettis Atomic Power Lab., West Mifflin, PA (USA)
DOE Contract Number:
EY-76-C-11-0014
OSTI ID:
6449179
Report Number(s):
WAPD-TM-1235
Country of Publication:
United States
Language:
English