Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

IAEA verification of materials accounting in commercial reprocessing plants

Journal Article · · Nucl. Mater. Manage. Annu. Meet. Proc.; (United States)
OSTI ID:6435511

The reprocessing plants currently under International Atomic Energy Agency (IAEA) safeguards have design capacities up to 210 tonnes of heavy metal per year. All of the plants use conventional materials accounting for safeguards. However, several larger commercial reprocessing plants are being designed with capacities of 350 to 1200 tonnes of heavy metal per year. It is likely that many of these plants, as well as some of the existing smaller ones, will adopt near-real-time materials accounting. The major effect of the combination of larger plants and near-real-time accounting on IAEA safeguards will be the demand for greater timeliness of verification. Continuous inspector presence may be required, as well as more on-site measurements by the inspector. In this paper, the authors review what needs to be verified, as well as current inspector activities in the process area. The bulk of the paper describes rapid, easy-to-use measurement techniques and instruments that may be applied to on-site verification measurements.

Research Organization:
Los Alamos National Lab., Los Alamos, NM
OSTI ID:
6435511
Journal Information:
Nucl. Mater. Manage. Annu. Meet. Proc.; (United States), Journal Name: Nucl. Mater. Manage. Annu. Meet. Proc.; (United States) Vol. 15:2; ISSN NUMMB
Country of Publication:
United States
Language:
English