Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Results of transient overpower events on breached and unbreached fuel pins

Conference ·
OSTI ID:6430163
The objective of the extended overpower tests on intact pins was to determine the pin cladding breaching thresholds vis-a-vis the Plant Protection System (PPS) trip settings, typically at approx.10 to 15% overpower. These tests emphasize slow operational-type transients in light of earlier work which suggested that irradiated mixed-oxide fuel pins may be particularly vulnerable in the slow ramp-rate regime. An overview of the extended overpower test series was previously reported. More recent results on two of the tests in this series are included in this paper. These two tests, designated TOPI-1A and TOPI-1B, were each conducted on a 19-pin assembly with various pin design, operation and burnup variables. The overpower ramp rates for the TOPI-1A and -1B tests were 0.1%/s and 10%/s, respectively.
Research Organization:
Argonne National Lab., IL (USA); Power Reactor and Nuclear Fuel Development Corp., Oarai, Ibaraki (Japan). Oarai Engineering Center
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
6430163
Report Number(s):
CONF-860931-14; ON: DE87004993
Country of Publication:
United States
Language:
English