Plant-support subsystem procurement documentation (RADL Item 7-44C)
Procurement documentation is presented for the long lead material required to be procured in support of the Piping and Mechanical Equipment Construction Package 9. The purchase specifications define the technical requirements for the specific long lead items to be procured. They represent the final specification as conformed for purchase. The hardware was grouped into three categories as follows: A. Primary Prefabricated Pipe (heavy wall and alloy), B. Primary Pipe Supports, and C. Pipe Support Snubbers. The detail technical specification for each of these procurement packages are included. The purchase orders issued for each of the procurement packages are included to provide a detailed listing of each procurement. A copy of the purchase order for each package is included. The need dates established for each of the various items of hardware is identified in the purchase specification and on the purchase orders. (LEW)
- Research Organization:
- Stearns-Roger Engineering Co., Denver, CO (USA)
- DOE Contract Number:
- AC03-79SF10499
- OSTI ID:
- 6427886
- Report Number(s):
- DOE/SF/10499-T13; SAN-0499-74; MDC-G-8592
- Country of Publication:
- United States
- Language:
- English
Similar Records
Plant-support subsystem procurement documentation (RADL Item 7-44A)
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Plant support subsystem procurement documentation (RADL Item 7-44C). Revision
Plant-support subsystem procurement documentation (RADL Item 7-44B)
Technical Report
·
Tue Jul 01 00:00:00 EDT 1980
·
OSTI ID:6517999
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Plant support subsystem procurement documentation (RADL Item 7-44C). Revision
Technical Report
·
Fri Oct 31 23:00:00 EST 1980
·
OSTI ID:5169621
Plant-support subsystem procurement documentation (RADL Item 7-44B)
Technical Report
·
Fri Aug 01 00:00:00 EDT 1980
·
OSTI ID:5961853