Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Plant-support subsystem procurement documentation (RADL Item 7-44C)

Technical Report ·
DOI:https://doi.org/10.2172/6427886· OSTI ID:6427886
Procurement documentation is presented for the long lead material required to be procured in support of the Piping and Mechanical Equipment Construction Package 9. The purchase specifications define the technical requirements for the specific long lead items to be procured. They represent the final specification as conformed for purchase. The hardware was grouped into three categories as follows: A. Primary Prefabricated Pipe (heavy wall and alloy), B. Primary Pipe Supports, and C. Pipe Support Snubbers. The detail technical specification for each of these procurement packages are included. The purchase orders issued for each of the procurement packages are included to provide a detailed listing of each procurement. A copy of the purchase order for each package is included. The need dates established for each of the various items of hardware is identified in the purchase specification and on the purchase orders. (LEW)
Research Organization:
Stearns-Roger Engineering Co., Denver, CO (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
6427886
Report Number(s):
DOE/SF/10499-T13; SAN-0499-74; MDC-G-8592
Country of Publication:
United States
Language:
English