Gnone site decontamination and decommissioning. Phase I. Radiological survey and operations report, Carlsbad, New Mexico

Technical Report ·
OSTI ID:6422740
This report describes the radiological survey conducted during Phase I of the Gnome site decontamination and decommissioning project in Carlsbad, New Mexico, by Reynolds Electrical and Engineering Co., Inc. (REECo) and EG and G, Inc., during the periods August 1 through September 30, 1977 and March 1, 1978 to the end of FY 1978. An aerial radiological survey and a gamma spectrometric ground survey were performed by EG and G, Inc., and an intensive radiological ground survey was conducted by REECo. The monitoring program included soil sampling and analyses, downhole gamma probe measurements, portable instrument surveys, and thermoluminescent dosimeter (TLD) gamma detection. Analyses of the data gathered in Phase I have provided the information necessary to plan operations for the decontamination and decommissioning of the Gnome site in Phase II and III. The principal objectives accomplished were an intensive radiological survey and an evaluation of the proposed cleanup guidelines by pathway analysis.
Research Organization:
Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (USA); EG and G, Inc., Las Vegas, NV (USA)
DOE Contract Number:
EY-76-C-08-0410
OSTI ID:
6422740
Report Number(s):
NVO-0410-48
Country of Publication:
United States
Language:
English

Similar Records

Gnome site decontamination and decommissioning project radiation contamination clearance report, March 28, 1979-September 23, 1979
Technical Report · Sat Aug 01 00:00:00 EDT 1981 · OSTI ID:6065032

Gnome site decontamination and decommissioning project
Conference · Sun Aug 01 00:00:00 EDT 1982 · OSTI ID:6845547

Project Gnome Decontamination and Decommissioning Plan
Technical Report · Sun Dec 31 23:00:00 EST 1978 · OSTI ID:6058292