Development and Testing of Industrial Scale, Coal-Fired Combustion System: Phase 3.
In the first quarter of calendar year 1997, 17 days of combustor- boiler tests were performed, including one day of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days required to meet the task 5 project plan. The key project objectives in the areas of combustor performance and environmental performance have been exceeded. With sorbent injection in the combustion gas train, NO{sub x} emissions as low as 0.07 lb/MMBtu and SO{sub 2} emissions as low as 0.2 lb/MMBtu have been measured in tests in this quarter. Tests in the present quarter have resulted in further optimizing the sorbent injection and NO{sub x} control processes. A very important milestone in this quarter was two successful combustor tests on a very high ash (37%) Indian coal. Work in the next quarter will focus on commercialization of the combustor- boiler system. In addition, further tests of the NO{sub x} and SO{sub 2} control process and on the Indian coal will be performed.
- Research Organization:
- Coal Tech Corp., Merion Station, PA (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
- DOE Contract Number:
- AC22-91PC91162
- OSTI ID:
- 641273
- Report Number(s):
- DOE/PC/91162--21; ON: DE98054312
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development and testing of industrial scale, coal-fire combustion system: phase 3
Development and Testing of Industrial Scale, Coal-Fired Combustin System, Phase 3. Twenty second technical progress report, April 1-June 30, 1997
Development and Testing of Industrial Scale, Coal Fired Combustion System, Phase 3: Twentieth quarterly technical progress report, October 1-December 31, 1996
Technical Report
·
Fri Aug 15 00:00:00 EDT 1997
·
OSTI ID:598765
Development and Testing of Industrial Scale, Coal-Fired Combustin System, Phase 3. Twenty second technical progress report, April 1-June 30, 1997
Technical Report
·
Tue Sep 30 00:00:00 EDT 1997
·
OSTI ID:620990
Development and Testing of Industrial Scale, Coal Fired Combustion System, Phase 3: Twentieth quarterly technical progress report, October 1-December 31, 1996
Technical Report
·
Wed Feb 26 23:00:00 EST 1997
·
OSTI ID:626466