Saguaro power plant solar repowering project

Technical Report ·
DOI:https://doi.org/10.2172/6407206· OSTI ID:6407206
The subsystem characteristics, design requirements, and system environmental requirements for the Saguaro Power Plant Solar Repowering Project are defined. The plant conceptual design, performance, and economic data to be provided for the solar additions are identified as well as certain design data for the existing plant. All of the 115 MWe net No. 1 steam-Rankine unit of the Saguaro station is to be repowered. The receiver heat transport fluid is draw salt (60% sodium nitrate and 40% potassium nitrate) that is also used to provide 4 hours of sensible heat storage. The receiver is quad-cavity type, and there is a field of 10,500 second generation heliostats. (LEW)
Research Organization:
Arizona Public Service Co., Phoenix (USA)
DOE Contract Number:
AC03-79SF10739
OSTI ID:
6407206
Report Number(s):
DOE/SF/10739-T4
Country of Publication:
United States
Language:
English