Estimation of the errors of conductor positioning in the LHC main magnets for a given multipole content
Journal Article
·
· IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States)
- CERN, Geneva (Switzerland)
CERN is preparing for the construction of a new high energy collider, the Large Hadron Collider (LHC). This new facility is based on a double ring of high field superconducting magnets installed in the 26.7 km long LEP tunnel, above the LEP machine components. Several model magnets have been built in common development programs with industry. Their measured field distribution exhibits multipole components which are due to perturbations of the coil block arrangements in the manufacturing process. In order to reduce these random errors it is necessary to know where they come from, thus allowing to specify appropriate tolerances for the construction.
- OSTI ID:
- 6385974
- Journal Information:
- IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States), Journal Name: IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States) Vol. 29:2; ISSN IEMGAQ; ISSN 0018-9464
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimization of the coil of the LHC main dipole
Coil end optimization for the LHC main dipole
The superconducting magnet system for the LHC
Journal Article
·
Sun Feb 28 23:00:00 EST 1993
· IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6385987
Coil end optimization for the LHC main dipole
Journal Article
·
Mon May 01 00:00:00 EDT 1995
· IEEE Transactions on Magnetics
·
OSTI ID:63120
The superconducting magnet system for the LHC
Conference
·
Thu Feb 28 23:00:00 EST 1991
· IEEE Transactions on Magnetics (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6093363
Related Subjects
43 PARTICLE ACCELERATORS
430300* -- Particle Accelerators-- Auxiliaries & Components
ACCELERATORS
BEAMS
CERN
COLLIDING BEAMS
DESIGN
ELECTRICAL EQUIPMENT
ELECTROMAGNETS
EQUIPMENT
ERRORS
FUNCTIONAL MODELS
INTERNATIONAL ORGANIZATIONS
MAGNETIC FIELDS
MAGNETS
MULTIPOLES
OPTIMIZATION
POSITIONING
PROBABILISTIC ESTIMATION
SUPERCONDUCTING DEVICES
SUPERCONDUCTING MAGNETS
430300* -- Particle Accelerators-- Auxiliaries & Components
ACCELERATORS
BEAMS
CERN
COLLIDING BEAMS
DESIGN
ELECTRICAL EQUIPMENT
ELECTROMAGNETS
EQUIPMENT
ERRORS
FUNCTIONAL MODELS
INTERNATIONAL ORGANIZATIONS
MAGNETIC FIELDS
MAGNETS
MULTIPOLES
OPTIMIZATION
POSITIONING
PROBABILISTIC ESTIMATION
SUPERCONDUCTING DEVICES
SUPERCONDUCTING MAGNETS