Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Long-range master plan for defense transuranic waste management

Technical Report ·
OSTI ID:6378326
The Long Range Master Plan for the Defense Transuranic Waste Program (DTWP), or ''Master Plan,'' details current TRU waste management plans and serves as a framework for the DTWP. Not all final decisions concerning activities presented in the Master Plan have been made (e.g., land withdrawal legislation, the WIPP Compliance and Operational Plan and the TRUPACT Certificate of Compliance). It is the goal of the DTWP to end interim storage and achieve permanent disposal of TRU waste. To accomplish this goal, as much TRU waste as possible will be certified to meet the WIPP Acceptance Criteria (WAC). The certified waste will then be disposed of at WIPP. The small quantity of waste which is not practical to certify will be disposed of via alternative methods that require DOE Headquarters approval and shall comply with the National Environmental Policy Act requirements and EPA/State Regulations. The definition of TRU waste is ''without regard to source or form, waste that is contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years and concentrations greater than 100 nanocuries/gram (nCi/g) at the time of assay. Heads of Field Elements can determine that other alpha contaminated wastes, peculiar to a specific site, must be managed as transuranic waste.''
Research Organization:
Westinghouse Electric Corp., Carlsbad, NM (USA). Waste Isolation Div.
DOE Contract Number:
AC04-86AL31950
OSTI ID:
6378326
Report Number(s):
DOE/WIPP-88-028; ON: DE89007450
Country of Publication:
United States
Language:
English